Human Research Facility (HRF) PCs Final Delivery

#

Task

Nominal Timeline

Responsibility

Notes

ROI Exp Team

ROI SW Team

PI

1

Decide the HRF PC Build "X" target for the experiment.

 

(✔)

 

This likely is based on orbit availability but also consider operating system, use, etc.

2

The HRF PC load will be built but each individual software piece of the integrated load will need:

 

 

 

 

 

2a

Baselined VDD

 

(✔)

(✔)

 

2b

Approved PDRT/IDAGS

 

(✔)

(✔)

 

2c

Completed Test Plan/TPS

 

(✔)

 

3

Export Control is done for the entire load.

 

 

 

 

4

A GCAR will be created for the entire integrated load. Individual experiment GCARs not needed if only part of an HRF PC integrated load.

 

 

 

 

5

A TRR will be completed by ROI Software integration for the HRF PC integrated load. Testing will be completed by ROI Software Integration for the HRF PC integrated load.

 

(✔)

 

 