Human Research Facility (HRF) PCs Final Delivery
# |
Task |
Nominal Timeline |
Responsibility |
Notes |
||
---|---|---|---|---|---|---|
ROI Exp Team |
ROI SW Team |
PI |
||||
1 |
Decide the HRF PC Build "X" target for the experiment. |
|
(✔) |
✔ |
|
This likely is based on orbit availability but also consider operating system, use, etc. |
2 |
The HRF PC load will be built but each individual software piece of the integrated load will need: |
|
|
|
|
|
2a |
|
(✔) |
✔ |
(✔) |
|
|
2b |
|
✔ |
(✔) |
(✔) |
|
|
2c |
Completed Test Plan/TPS |
|
(✔) |
✔ |
✔ |
|
3 |
Export Control is done for the entire load. |
|
|
✔ |
|
|
4 |
A GCAR will be created for the entire integrated load. Individual experiment GCARs not needed if only part of an HRF PC integrated load. |
|
|
✔ |
|
|
5 |
A TRR will be completed by ROI Software integration for the HRF PC integrated load. Testing will be completed by ROI Software Integration for the HRF PC integrated load. |
|
(✔) |
✔ |
|
|