Pre-Delivery Software Testing (Uncontrolled)

A review is required for uncontrolled testing of the software in an equivalent environment to ISS to discover any anomalies before official delivery.

#

Task

Nominal Timeline

Responsibility

Notes

ROI Exp Team

ROI SW Team

PI

1

For SSC software: Contact the SSC Lab for a machine account and path info for the ls1 server.

 

 

 

PI/Developer to setup an account. Requires NDC access.

2

Perform test per Test Plan to verify functionality of software and prove requirements are met.

 

(✔)

 

Likely use test plan completed as part of JPR requirements. This verification will be included in the delivery to ROI.

3

For HRF load, can be provided a laptop for testing.

 

(✔)

(✔)

 

4

EST to also perform SVT like operational testing and out of bounds/stress testing and procedure verification, if applicable.

 

(✔)

(✔)

Building 241 has a flight-like environment if SSC lab testing schedule is full. If need to add steps to official test plan, include with delivery.

✔ - Primary Responsibility, (✔) - Secondary Responsibility (assists Primary)